Erosion Control & Stormwater Management

Print
Press Enter to show all options, press Tab go to next option

CHAPTER 27 - EROSION CONTROL & STORMWATER MANAGEMENT ORDINANCE

The purpose of this ordinance is to set the requirements for land development and land disturbing activities aimed to minimize sedimentation, water pollution, flooding and related property and environmental damage caused by soil erosion and uncontrolled stormwater runoff during and after construction. This ordinance is intended to regulate construction site erosion and stormwater management. This ordinance is not intended to limit activity or land divisions permitted under the applicable zoning and land division ordinances.

Permit forms for Chapter 27:

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer